To deliver reliable, efficient, and quality electric service at a reasonable cost for the delight of its stakeholders.
Billing Month • May 2023
Residential • ₱ 12.52/kWh
Low Voltage • ₱ 12.57/kWh
High Voltage • ₱ 10.81/kWh
A leading distribution utility preferred by member-consumer-owners under a competitive environment.
Cooperative • Transmission • Other
POWER ADVISORY: Please be informed that there will be a power service interruption on the following dates: *MAY 24, 2023 (Wednesday) 9:00 am to 4:00 pm Affected areas: Brgy. Bucal, Sumucab, Cansuso, Paowin, Sitio Calminue, Sitio Patola, & Sitio Bucal (Cavinti) *MAY 25, 2023 (Thursday) 9:00 am to 5:00 pm Affected areas: Brgy. Bacong-sigsigan and a portion of Brgy. Kataypuanan (Famy) REASON: Replacement of bare wire with tree wire, installation of fuse cutouts, and right-of-way clearing
NGCP POWER ADVISORY: Please be informed that the National Grid Corporation of the Philippines (NGCP) has scheduled a power service interruption on MAY 13, 2023 (Saturday), from 6:00 am to 6:00 pm, in the following areas: AFFECTED AREAS: Pakil, Pangil, Siniloan, Famy, Mabitac, and Sta. Maria REASON: Preventive/corrective maintenance along the line and PM/PMT of associated HVE equipment
POWER ADVISORY: Please be informed that there will be a power service interruption on the following dates: *MAY 9, 2023 (TUE), 8:30 AM TO 4:00 PM AFFECTED AREAS: Portion of Brgy. Duhat, Layasin, Banco, and Bulajo (Cavinti) *MAY 11, 2023 (THU), 9:00 AM to 5:00 PM AFFECTED AREAS: Brgy. Bucal, Sumucab, Cansuso, Paowin, Sitio Calminue, Sitio Patola, & a portion of Brgy. Inao-awan (Cavinti) REASON: Replacement of bare wire with tree wire, relocation of primary poles, and right-of-way clearing
Bid Bulletin
Supply, delivery, installation, energization, and commissioning of a 69KV SF6 dead tank power circuit breaker, 13.2KV current and potential transformer, and cable trench construction
Line Maintenance Hardwares • Amorphous Distribution Transformer • Conductor, Duplex • Steel & Concrete Poles • KWH Meter
Cooperative History
The First Laguna Electric Cooperative, Inc. (FLECO) was incorporated and registered with the National Electrification Administration (NEA) on April 3, 1973 under Presidential Decree 269.
The operation of FLECO commenced on September 1, 1973 when it took over seven (7) private electric franchises and municipal systems, namely: Siniloan Electric which covered the towns of Siniloan, Pangil, Pakil, Mabitac and Sta. Maria; Pagsanjan Electric System; Paete Electric Service; Lumban Electric System; Kalayaan Electric System; Cavinti Electric System and Calim &. Jamilano Electric Co., which served the town of Famy.
Initially, FLECO contracted a loan with the NEA to pay for taken-over private systems and to fund the rehabilitation of old lines and its service expansion.
Learn MoreOur Workforce
General Manager
Finance Manager
Corplan Manager
Technical Manager
Institutional Manager
Audit Manager
Frequently Asked Questions