To deliver reliable, efficient, and quality electric service at a reasonable cost for the delight of its stakeholders.
Billing Month • Nov 2023
Residential • ₱ 10.57/kWh
Low Voltage • ₱ 10.82/kWh
High Voltage • ₱ 8.90/kWh
A leading distribution utility preferred by member-consumer-owners under a competitive environment.
Cooperative • Transmission • Other
NGCP ADVISORY (UPDATED SCHEDULE): Please be informed that the National Grid Corporation of the Philippines (NGCP) will conduct technical activities on DECEMBER 3, 2023 (Sunday), from 6:00 AM to 9:00 AM (3 HOURS), in the whole FLECO coverage area. AFFECTED AREAS: Cavinti, Pagsanjan, Lumban, Kalayaan, Paete, Pakil, Pangil, Siniloan, Famy, Mabitac, & Sta. Maria Thank you for bearing with us. Please share. #NGCP
POWER ADVISORY: Please be informed that there will be a power service interruption on November 16, 2023 (Thursday), from 9:00 am to 5:00 pm, in Brgy. Cambuja, Sitio Lamor, and Paang Bundok (Sta. Maria), due to the replacement of wires and a primary pole, and right-of-way clearing.
ANNOUNCEMENT: Matapos ipatupad ang ONE-TIME REFUND nitong nakaraang Oktubre, ipinababatid na nagbalik na po sa karaniwang presyo ang ating power rates ngayong buwan. Ang pagtaas ng November 2023 power rates ay dahil natapos na po ang pagbabalik natin ng over recoveries alinsunod sa atas ng Energy Regulatory Commission (ERC). November 2023 Power Rates: Residential: P10.5737/kWh Low Voltage: P10.8157/kWh High Voltage: P8.9039/kWh Maraming salamat po.
Bid Bulletin
CURRENT TRANSFORMER, Ratio - 20:5, Voltage Rating - 15kV, Accuracy Class - Metering Type, Installation Type - Outdoor • POTENTIAL TRANSFORMER, Ratio - 70:1, Voltage Rating - 15kV, Accuracy Class - Metering Type, Installation Type - Outdoor
Concrete Pole, 35', Class 5, 1000 kgs. (Minimum Load Break) • Conductor, Bare, ACSR #2/0, AWG 6/1 (meters) • Base, Meter Socket CL200, 5 Jaws • Bracket, Secondary without Spool • Clevis, Secondary Swinging 1 3/4 HDG • Washer, Square Flat 2-1/4 x 2-1/4 x 3/16 HDG • Current Transformer, 100:5 600V • Current Transformer, 200:5 600V • Current Transformer, 300:5 600V • Cable Tie Nylon Wrap 8x300mm • CT Box 3 Phase
Amorphous Distribution Transformer, 100 KVA
Cooperative History
The First Laguna Electric Cooperative, Inc. (FLECO) was incorporated and registered with the National Electrification Administration (NEA) on April 3, 1973 under Presidential Decree 269.
The operation of FLECO commenced on September 1, 1973 when it took over seven (7) private electric franchises and municipal systems, namely: Siniloan Electric which covered the towns of Siniloan, Pangil, Pakil, Mabitac and Sta. Maria; Pagsanjan Electric System; Paete Electric Service; Lumban Electric System; Kalayaan Electric System; Cavinti Electric System and Calim &. Jamilano Electric Co., which served the town of Famy.
Initially, FLECO contracted a loan with the NEA to pay for taken-over private systems and to fund the rehabilitation of old lines and its service expansion.
Learn MoreFrequently Asked Questions