To deliver reliable, efficient, and quality electric service at a reasonable cost for the delight of its stakeholders.
Billing Month • Dec/2022
Residential • ₱ 16.5/kWh
Low Voltage • ₱ 17.45/kWh
High Voltage • ₱ 14.77/kWh
A leading distribution utility preferred by member-consumer-owners under a competitive environment.
Cooperative • Transmission • Other
POWER ADVISORY: Please be informed that there will be a power service interruption on JANUARY 26, 2023 (THURSDAY), in the following areas: *8:30 AM TO 2:00 PM: Talisay Road of Brgy. Binan & Sabang to Daang Bakal of Brgy. Cabanbanan (Pagsanjan) *9:00 AM TO 4:30 PM: Brgy. Banco (Cavinti) *9:30 AM TO 4:00 PM: Boundary of Pakil-Paete: Brgy. Taft (Pakil)& Brgy. 7 (Paete) REASONS: Replacement of bare wire to tree wire, retrieval of rotten poles, and right-of-way clearing
POWER ADVISORY: Please be informed that there will be a power service interruption tomorrow, January 24, 2023 (Tuesday), from 8:00 AM to 5:00 PM, due to the replacement of primary lines and poles, in the following: AFFECTED AREAS: Brgy. Sto. Nino, Lumban (including Sto. Nino School-Annex, Lumban Public Market, and MW Town Store, and a portion of Tabia St.) Thank you for bearing with us. Please share.
POWER ADVISORY: Please be informed that there will be a power service interruption in Brgy. Cabuoan (Sta. Maria) tomorrow, January 19, 2023 (Thu), from 9:00 am to 5:00 pm, due to the replacement of bare wire to tree wire and relocation of pole. Thank you for bearing with us. Please share.
Bid Bulletin
Line Maintenance Hardwares • Transformers (ADT • CT) • Conductor, Duplex • Tree Wires • Steel • Concrete Poles • KWH Meter 5(100)A
Supply, delivery, installation, energization, and commissioning of a 69KV SF6 dead tank power circuit breaker, 13.2KV current and potential transformer, and cable trench construction
Cooperative History
The First Laguna Electric Cooperative, Inc. (FLECO) was incorporated and registered with the National Electrification Administration (NEA) on April 3, 1973 under Presidential Decree 269.
The operation of FLECO commenced on September 1, 1973 when it took over seven (7) private electric franchises and municipal systems, namely: Siniloan Electric which covered the towns of Siniloan, Pangil, Pakil, Mabitac and Sta. Maria; Pagsanjan Electric System; Paete Electric Service; Lumban Electric System; Kalayaan Electric System; Cavinti Electric System and Calim &. Jamilano Electric Co., which served the town of Famy.
Initially, FLECO contracted a loan with the NEA to pay for taken-over private systems and to fund the rehabilitation of old lines and its service expansion.