To deliver reliable, efficient, and quality electric service at a reasonable cost for the delight of its stakeholders.
Billing Month • Mar 2024
Residential • ₱ 9.9995/kWh
Low Voltage • ₱ 11.4146/kWh
High Voltage • ₱ 8.3692/kWh
A leading distribution utility preferred by member-consumer-owners under a competitive environment.
Cooperative • Transmission • Other
NGCP POWER ADVISORY: Please be informed that the National Grid Corporation of the Philippines (NGCP) has scheduled a power service interruption on MARCH 3, 2024 (Sunday), from 6:00 am to 6:00 pm, in the entire FLECO coverage area. Thank you for bearing with us. Please share. #NGCP
POWER ADVISORY: Please be informed that there will be a MOMENTARY power interruption on FEBRUARY 1, 2024 (Thursday), due to the feeder load transferring for the installation of an instrument transformer at Pakil Substation. 15 MINUTES ONLY - Morning: Anytime between 7:00 am - 7:30 am; AFFECTED AREAS: Whole towns of Paete, Pakil (except barrios), & Pangil (except barrios) 15 MINUTES ONLY - Afternoon: Anytime between 3:00 pm - 6:00 pm; AFFECTED AREAS: Whole towns of Paete, Pakil (except barrios), & Pangil (except barrios), Kalayaan, Siniloan (except upland barangays), Mabitac (except Brgy. Paagahan, Amuyong, San Miguel, Nanguma, Matalatala, & Numero)
POWER ADVISORY: Please be informed that there will be a power service interruption on JANUARY 30, 2024 (Tuesday), from 9:00 am to 4:00 pm, in a portion of Brgy. Isla (Pangil), due to the replacement of a primary pole. Please share.
Bid Bulletin
Amorphous Distribution Transsformer 15KVA • Amorphous Distribution Transsformer 25KVA • Amorphous Distribution Transsformer 37.5KVA • Amorphous Distribution Transsformer 50KVA
Line Maintenance Hardwares • Transformers (ADT • CT) • Conductor, Duplex • Insulated Primary Conductor • Steel • Concrete Poles • KWH Meters
Cooperative History
The First Laguna Electric Cooperative, Inc. (FLECO) was incorporated and registered with the National Electrification Administration (NEA) on April 3, 1973 under Presidential Decree 269.
The operation of FLECO commenced on September 1, 1973 when it took over seven (7) private electric franchises and municipal systems, namely: Siniloan Electric which covered the towns of Siniloan, Pangil, Pakil, Mabitac and Sta. Maria; Pagsanjan Electric System; Paete Electric Service; Lumban Electric System; Kalayaan Electric System; Cavinti Electric System and Calim &. Jamilano Electric Co., which served the town of Famy.
Initially, FLECO contracted a loan with the NEA to pay for taken-over private systems and to fund the rehabilitation of old lines and its service expansion.
Learn MoreFrequently Asked Questions