POWER ADVISORY: Please be informed that there will be a power interruption on the following: MARCH 19, 2025 (WED), 9:00 AM TO 1:00 PM AFFECTED AREA: Brgy. Dorado (Pakil) MARCH 20, 2025 (THU), 9:00 AM TO 5:00 PM AFFECTED AREAS: Brgy. Cueva (Sta. Maria), Brgy. Cuebang Bato (Famy), & Brgy. Magsaysay (Infanta, Quezon) REASONS: Replacement of bare wires with insulated wires, relocation of primary poles, & right-of-way clearing Power will be restored without prior notice upon completion of work. Any changes in the schedule shall be advised.
Power Supply Procurement Plan (2024) - First Laguna Electric Cooperative, Inc.
NCGP ADVISORY: Please be informed that there will be a power interruption on June 1, 2024 (Saturday), from 6:00 am to 6:00 pm, due to the various maintenance works of NGCP along their 69kV lines near FLECO's 13.2kV line. AFFECTED AREAS: -Brgy. Mayatba, Laguio, Liyang, Kapatalan, & a portion of Macatad (Siniloan) -Brgy. Liyang, Laguio, Mayatba, Kataypuanan, Bacong-sigsigan, & Kapatalan (Famy)
Bid Bulletin
SSPSJN01 – Pagsanjan • SSLMBN02 – Lumban 1 • SSLMBN03 – Lumban 2
Lot 1 - Duplex Conductors & Insulated Wires • Lot II - Steel & Concrete Poles • Lot III - KWH Meters & CTs • Lot IV - Line Maintenance Hardwares • Lot V - Distribution Transformers
Construction of Main Main Office Multi-Purpose Hall (5,489,638.08)
Cooperative History
The First Laguna Electric Cooperative, Inc. (FLECO) was incorporated and registered with the National Electrification Administration (NEA) on April 3, 1973 under Presidential Decree 269.
The operation of FLECO commenced on September 1, 1973 when it took over seven (7) private electric franchises and municipal systems, namely: Siniloan Electric which covered the towns of Siniloan, Pangil, Pakil, Mabitac and Sta. Maria; Pagsanjan Electric System; Paete Electric Service; Lumban Electric System; Kalayaan Electric System; Cavinti Electric System and Calim &. Jamilano Electric Co., which served the town of Famy.
Initially, FLECO contracted a loan with the NEA to pay for taken-over private systems and to fund the rehabilitation of old lines and its service expansion.