FLECO, Inc - Menu
Announcement
SA LAHAT NG FLECO MEMBER-CONSUMER-OWNERS: IPINABABATID PONG MAGKAKAROON NG 30-DAY EXTENSION ANG ELECTRIC BILLS NA SASAILALIM SA METER READING SIMULA NGAYONG ARAW, MARSO 18, 2020. IBIG SABIHIN, IMBES NA 10 ARAW LAMANG ANG PALUGIT SA PAGBABAYAD, MAGIGING 30 ARAW NA PO ANG GRACE PERIOD. ITO PO AY BILANG PAGSUNOD SA DIREKTIBA NG MALACANANG.
Announcement
PINAPAYUHAN DIN PO ANG LAHAT NA MAGBAYAD SA ATING PAYMENT CENTERS (TULAD NG FLECO POWERPAY, 7/11 BRANCHES, TRUE MONEY, EC PAY, LBC, PERA HUB, BAYAD CENTERS, GLOBE GCASH, AT IBA PA) UPANG MAIWASAN ANG PAGDAMI O PAGSASABAY-SABAY NG MCOS NA MAGBABAYAD SA ATING MGA OPISINA. ANG ATING KOOP AY MAHIGPIT NA NAGPAPATUPAD NG PREVENTIVE MEASURES TULAD NG TEMPERATURE CHECK AT SOCIAL DISTANCING SA LAHAT NG OPISINA.
Announcement
NGCP POWER ADVISORY: PLEASE BE INFORMED THAT THE NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) WILL BE CONDUCTING TECHNICAL ACTIVITIES ON AUGUST 29, 2020 (SATURDAY), FROM 6:00 AM TO 6:00 PM, IN THE FOLLOWING AREAS: AFFECTED AREAS: -TOWNS OF CAVINTI, PAGSANJAN, & LUMBAN (6:00 AM TO 6:00 PM) -TOWNS OF KALAYAAN & PAETE (15 MINUTES MOMENTARY INTERRUPTION ONLY) POWER WILL BE RESTORED UPON COMPLETION OF WORK WITHOUT PRIOR NOTICE. ANY CHANGES IN THE SCHEDULE OF INTERRUPTION SHALL BE ADVISED. THANK YOU FOR BEARING WITH US. PLEASE SHARE. #NGCP
OPEN ACCESS AND LOAD PROFILE

Republic Act 9136 provides implementation of retail competition and open access on distribution wires. Initially, the Energy Regulatory Commission shall allow all electricity end-users with a monthly average peak demand of at least one megawatt (1MW) for the preceeding twelve (12) months to be the contestable market. Two (2) years thereafter, the threshold level for the contestable market shall be reduced to seven hundred fifty kilowatts (750kw). Subsequently and every year thereafter, the ERC shall evaluate the performance of the market.

FLECO in its present condition does not serve any customer with a monthly average peak demand of 1MW. Its customers are mainly residential with some commercial but very few low load industrial consumers. Hence, its consumers are not yet qualified to join the market on open access. It may take a little more time for big load industrial consumers to settle at the FLECO franchise area meantime that development is just starting at the area. However, FLECO anticipates that industry will be at its height in Pagsanjan considering that tourism is its prime business.